COMUNICADOS DE PRENSA

» 27/06/2012
2BG, installed Nr.2 PV systems on its own productions sites

» 05/03/2012
2BG, received order for upgrade to 40 MW of Cappello line

» 20/01/2012
2BG, installed soldering robotic station

» 20/07/2011
2BG, delivered and installed automatic line for crystalline modules of 20 MW to Renewables

» 08/04/2011
Installed 50 MW automatic line for AV Project

» 26/11/2010
2BG, Contract for Tabber&Stringer supply in China

» 03/11/2010
Contract for 12 MW automatic line to Hi Technology

» 31/08/2010
2BG, completed expansion automatic line for crystalline modules of 10 MW for CAPPELLO ALLUMINIO

» 25/08/2010
2BG, installed SPIRIT BIPV at ENERGY GLASS

» 23/04/2010
Delivery of 50 MW automatic line to ITALIA SOLARE INDUSTRIE

» 19/02/2010
Contract for 15 MW automatic line in Algerian

» 12/02/2010
Installed 15 MW automatic line for AV Project upgrade

» 05/02/2010
Contract for 15 MW automatic line in Slovenia

» 30/08/2009
BACK END THIN FILM

» 29/08/2009
2BG su ENF

» 28/08/2009
2BG on PV Source

» 27/08/2009
2BG Greece

» 26/08/2009
2BG = AUTOMATION

» 23/07/2009
2BG P Energy

2BG, completada la expansión de la línea automática por módulos cristalinos de 50 MW por AVProject.

08/04/2011

Completada la ampliación de la instalación para la producción de módulos cristalinos de 50 MW (desde los precedentes 25 MW) en la empresa AVProject (Avellino – ITALIA), que ha llevado además del aumento de la capacidad productiva, también la introdución de nueva soluciones y una configuración basada en las necesidades del cliente y de los espacios de producción.

Con cuatro Tabber&Stringer SPIRIT, con una capacidad productiva total de 2.400 celdas por hora, AVProject se convierte en uno de los principales productores italianos.