PRESS RELEASE

» 27/06/2012
2BG, installed Nr.2 PV systems on its own productions sites

» 05/03/2012
2BG, received order for upgrade to 40 MW of Cappello line

» 20/01/2012
2BG, installed soldering robotic station

» 20/07/2011
2BG, delivered and installed automatic line for crystalline modules of 20 MW to Renewables

» 08/04/2011
Installed 50 MW automatic line for AV Project

» 26/11/2010
2BG, Contract for Tabber&Stringer supply in China

» 03/11/2010
Contract for 12 MW automatic line to Hi Technology

» 31/08/2010
2BG, completed expansion automatic line for crystalline modules of 10 MW for CAPPELLO ALLUMINIO

» 25/08/2010
2BG, installed SPIRIT BIPV at ENERGY GLASS

» 23/04/2010
Delivery of 50 MW automatic line to ITALIA SOLARE INDUSTRIE

» 19/02/2010
Contract for 15 MW automatic line in Algerian

» 12/02/2010
Installed 15 MW automatic line for AV Project upgrade

» 05/02/2010
Contract for 15 MW automatic line in Slovenia

» 30/08/2009
BACK END THIN FILM

» 29/08/2009
2BG on ENF

» 28/08/2009
2BG on PV Source

» 27/08/2009
2BG Greece

» 26/08/2009
2BG = AUTOMATION

» 23/07/2009
2BG P Energy

2BG, received order for upgrade to 40 MW of Cappello line

05/03/2012

Completed the order for upgrade to 40 MW production plant (from the previous 20 MW) at Cappello company (Ragusa – ITALY), which has brought besides the throughput increase, also the new solutions introduction and a custom-made configuration based on tight facility space.

The strengthen cooperation that 2BG created with each customer, during the years, benefits from the joint of both experiences in optimizing the process technology. This type of collaboration is now in a concrete step between the R&D Division of 2BG and Cappello Group: the first gives all the engineering support for reaching the goal and the second makes at disposal its continuous manufacturing volume; the object is the industry testing of the IC200AR (last evolved model) under real extreme productive conditions. Both firms have agreed to integrate this fully-automatic system for the string interconnection soldering in the current line, monitoring the performances in different applications; as this is the most focus of the assembling module process, where high quality criterions have to be respected for an efficient product with long lifetime.

With this robotic solution, Cappello becomes one of the leader players in the Italian pv industry, proudly following the technology evolution despite the current market weakness.