COMUNICADOS DE PRENSA

» 27/06/2012
2BG, installed Nr.2 PV systems on its own productions sites

» 05/03/2012
2BG, received order for upgrade to 40 MW of Cappello line

» 20/01/2012
2BG, installed soldering robotic station

» 20/07/2011
2BG, delivered and installed automatic line for crystalline modules of 20 MW to Renewables

» 08/04/2011
Installed 50 MW automatic line for AV Project

» 26/11/2010
2BG, Contract for Tabber&Stringer supply in China

» 03/11/2010
Contract for 12 MW automatic line to Hi Technology

» 31/08/2010
2BG, completed expansion automatic line for crystalline modules of 10 MW for CAPPELLO ALLUMINIO

» 25/08/2010
2BG, installed SPIRIT BIPV at ENERGY GLASS

» 23/04/2010
Delivery of 50 MW automatic line to ITALIA SOLARE INDUSTRIE

» 19/02/2010
Contract for 15 MW automatic line in Algerian

» 12/02/2010
Installed 15 MW automatic line for AV Project upgrade

» 05/02/2010
Contract for 15 MW automatic line in Slovenia

» 30/08/2009
BACK END THIN FILM

» 29/08/2009
2BG su ENF

» 28/08/2009
2BG on PV Source

» 27/08/2009
2BG Greece

» 26/08/2009
2BG = AUTOMATION

» 23/07/2009
2BG P Energy

2BG, entregada y instalada línea automática para la producción de módulos cristalinos de 20 MW a la empresa Renewables.

20/07/2011

Entregada e instalada línea para la producción de módulos cristalinos de 20 MW a la empresa Renewables (Messina – ITALIA - www.renewablesgroup.it ), que lidera la introducción de nuevas soluciones y una configuración adaptada a las necesidades de los clientes y de los espacios de producción. Con la Soldadora de cordones SPIRIT, de la capacidad total productiva de 1.200 celdas/hora y numerosos controles automáticos de proceso, Renewables produce módulos de calidad garantizada y siempre monitorizada.