COMUNICATI STAMPA

» 27/06/2012
2BG, installed Nr.2 PV systems on its own productions sites

» 05/03/2012
2BG, received order for upgrade to 40 MW of Cappello line

» 20/01/2012
2BG, installed soldering robotic station

» 20/07/2011
2BG, delivered and installed automatic line for crystalline modules of 20 MW to Renewables

» 08/04/2011
Installed 50 MW automatic line for AV Project

» 26/11/2010
2BG, Contract for Tabber&Stringer supply in China

» 03/11/2010
Contract for 12 MW automatic line to Hi Technology

» 31/08/2010
2BG, completed expansion automatic line for crystalline modules of 10 MW for CAPPELLO ALLUMINIO

» 25/08/2010
2BG, installed SPIRIT BIPV at ENERGY GLASS

» 23/04/2010
Delivery of 50 MW automatic line to ITALIA SOLARE INDUSTRIE

» 19/02/2010
Contract for 15 MW automatic line in Algerian

» 12/02/2010
Installed 15 MW automatic line for AV Project upgrade

» 05/02/2010
Contract for 15 MW automatic line in Slovenia

» 30/08/2009
BACK END THIN FILM

» 29/08/2009
2BG su ENF

» 28/08/2009
2BG on PV Source

» 27/08/2009
2BG Greece

» 26/08/2009
2BG = AUTOMATION

» 23/07/2009
2BG P Energy

2BG, consegnata ed installata linea automatica per moduli cristallini da 20 MW alla Renewables.

20/07/2011

Consegnato ed installato impianto per la produzione di moduli cristallini da 20 MW presso l’azienda Renewables (Messina – ITALIA - www.renewablesgroup.it ), che ha portato l’introduzione di nuove soluzioni ed una configurazione studiata su misura delle esigenze del cliente e degli spazi produttivi. Con stringatrici SPIRIT, dalla capacità produttiva totale di 1.200 cella/ora e numerosi controlli automatici di processo, Renewables è in grado di produrre moduli dalla qualità garantita e costantemente monitorata.