PRESS RELEASE

» 27/06/2012
2BG, installed Nr.2 PV systems on its own productions sites

» 05/03/2012
2BG, received order for upgrade to 40 MW of Cappello line

» 20/01/2012
2BG, installed soldering robotic station

» 20/07/2011
2BG, delivered and installed automatic line for crystalline modules of 20 MW to Renewables

» 08/04/2011
Installed 50 MW automatic line for AV Project

» 26/11/2010
2BG, Contract for Tabber&Stringer supply in China

» 03/11/2010
Contract for 12 MW automatic line to Hi Technology

» 31/08/2010
2BG, completed expansion automatic line for crystalline modules of 10 MW for CAPPELLO ALLUMINIO

» 25/08/2010
2BG, installed SPIRIT BIPV at ENERGY GLASS

» 23/04/2010
Delivery of 50 MW automatic line to ITALIA SOLARE INDUSTRIE

» 19/02/2010
Contract for 15 MW automatic line in Algerian

» 12/02/2010
Installed 15 MW automatic line for AV Project upgrade

» 05/02/2010
Contract for 15 MW automatic line in Slovenia

» 30/08/2009
BACK END THIN FILM

» 29/08/2009
2BG on ENF

» 28/08/2009
2BG on PV Source

» 27/08/2009
2BG Greece

» 26/08/2009
2BG = AUTOMATION

» 23/07/2009
2BG P Energy

2BG = AUTOMATION

26/08/2009

2BG Automation

2BG srl brand was recognized as the symbol of automation by Solar, the PV Management Magazine: who wanted to insert an advertisement of our company next to their editorial on automation, titled “Automating Solar Manufacturing”.

“Top manufacturing executives in the solar industry are challenged to find the most effective tools and processes to gain more productivity and decrease costs within a set budget. This article addresses how the use of automation within this new industry can provide these top executives with the key components to maximize factory throughput, drive down costs and improve efficiencies.”

For more information about, please see the softcopy below.